The past two weeks have been very unproductive, for the car anyway. I had a weekend trip home and some late nights at work. I was finally able to put in some time this past Friday and Saturday. The vette is stripped down to the bare minimum as you can see from the new pics. I’ve been devoting my time to getting the “paint booth” built. Thirty 10’ sticks of 1” PVC and a shload of tees and elbows have netted a framework for my paint booth. I’ll save the final assembly for right before I have the car all sanded and prepped. It will take up most of the garage, so no need to cut down my workspace sooner than necessary. I was really hoping to be able to spray some color this weekend, but that is not going to happen, still a lot of prep to do. No need to skimp now, prep is the most important part, and the most time consuming. Oh well.
Till tomorrow….
Parts replaced this week:
None
Parts cost so far: $1425
No comments:
Post a Comment